Eco Garden Bridge 2
Eco Garden Bridge 2
Eco Garden Bridge 1
Eco Garden Bridge 1

 
DESIGN & BUILD / RE-ENGINEERING
  • Cast In situ post tensioned balance cantilever bridge using steel traveller form
  • Cast in situ reinforced concrete box girder using heavy duty shoring
  • Cast in situ post tensioned beams, suitable for curve bridge
  • Incremental launching post tensioned bridge, bridge is cast near the shore and push outward to the pier
  • Approach Bridge Structure
  • Pre-tensioned Bridge
  • Post-tensioned Bridge

view more »

Other Projects
RE WALL PARAPET WALL
PROPOSED PERINDUSTRIAN KECIL & SEDERHANA DI ATAS LOT 560 & 561,
JALAN SKUDAI / JALAN KEMPAS LAMA, JOHOR BAHRU
 
- PROPOSED RE WALL PARAPET WALL
 
Project Completion:   MARCH 2014                                                                                                                                                                       
Client:   FLAGSHIP BUILDERS S
Main-Con:   SUPERB CONSTRUCTION & TRADING SDN BHD
Sub-Con:   S. P. MULIA SDN BHD
 

 

parapet wall_1
parapet wall_10
parapet wall_2
parapet wall_3
parapet wall_4
parapet wall_5
parapet wall_6
parapet wall_7
parapet wall_8
parapet wall_9
SEBANA COVE JETTY
PROPOSED RECONSTRUCTION AND COMPLETION OF JETTY AND ROAD
RESURFACING FOR CLUB HOUSE AND HOTEL AREA ON LOT PTD 2940,
SEBANA COVE RESORT, MUKIM PENGERANG, DAERAH KOTA TINNGI, JOHOR
DARUL TAKZIM FOR MESSRS SEBANA GOLF AND MARINA RESORT SDN BHD
 
Project Completion:   NOVEMBER 2014                                                                                                                                                                     
Client:   IJM LAND
Main-Con:   XING GUANG CONSTRUCTION SDN BHD
Sub-Con:   S. P. MULIA SDN BHD
 

 

sebana cove jetty_1
sebana cove jetty_10
sebana cove jetty_11
sebana cove jetty_13
sebana cove jetty_14
sebana cove jetty_15
sebana cove jetty_16
sebana cove jetty_17
sebana cove jetty_18
sebana cove jetty_19
sebana cove jetty_2
sebana cove jetty_20
sebana cove jetty_21
sebana cove jetty_3
sebana cove jetty_4
sebana cove jetty_5
sebana cove jetty_6
sebana cove jetty_7
sebana cove jetty_8
sebana cove jetty_9
IKEA TEBRAU CITY
CADANGAN PEMAJUAN 1 BLOK KOMPLEKS PERDAGANGAN 2 TINGKAT DAN 1 TINGKAT SEPARA BASEMAN (TEMPAT LETAK KERETA) FASA 1, DI ATAS SEBAHAGIAN LOT 102078, PERSIARAN BANDAR DESA TEBRAU, TAMAN DESA TEBRAU, MUKIM TEBRAU, JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK TETUAN IKANO JOHOR JAYA SDN BHD
- PROPOSED RC PUMP SUMP 
 
Project Completion:   MAY 2017
Client:   TENTU TEGUH SDN BHD
Main-Con:   KIMLUN SDN BHD
Sub-Con:   S. P. MULIA SDN BHD
 

 

IKEA RC PUMP SUMP_01
IKEA RC PUMP SUMP_02
IKEA RC PUMP SUMP_03
IKEA RC PUMP SUMP_04
IKEA RC PUMP SUMP_05
IKEA RC PUMP SUMP_06
IKEA RC PUMP SUMP_07
IKEA RC PUMP SUMP_08
IKEA RC PUMP SUMP_09
IKEA RC PUMP SUMP_10
IKEA RC PUMP SUMP_11
IKEA RC PUMP SUMP_12
IKEA RC PUMP SUMP_13
IKEA RC PUMP SUMP_14
IKEA RC PUMP SUMP_15
IKEA RC PUMP SUMP_16
IKEA RC PUMP SUMP_17
IKEA RC PUMP SUMP_18
IKEA RC PUMP SUMP_19
IKEA RC PUMP SUMP_20
IKEA RC PUMP SUMP_21
IKEA RC PUMP SUMP_22
IKEA RC PUMP SUMP_23
IKEA RC PUMP SUMP_24
IKEA RC PUMP SUMP_25
IKEA RC PUMP SUMP_26
IKEA RC PUMP SUMP_27
IKEA RC PUMP SUMP_28
IKEA RC PUMP SUMP_29
IKEA RC PUMP SUMP_30
JPJ MUAR WORK BELOW LOWEST FLOOR FINISH
CADANGAN MEROBOH 2 BLOK BANGUNAN SEDIA ADA DAN MEMBINA SEMULA BANGUNAN PEJABAT BARU 2 TINGKAT DI JABATAN PENGANGKUTAN JALAN (JPJ) MUAR, JOHOR DARUL TAKZIM
 
Completion Date:   OCTOBER 2018
Client:   JABATAN KERJA RAYA (JKR)
Main-Con:   CLEAN IMAGE SDN BHD
Sub-Con:   S. P. MULIA SDN BHD

 

jpj muar_01
jpj muar_02
jpj muar_03
jpj muar_04
jpj muar_05
jpj muar_06
jpj muar_07
jpj muar_08
jpj muar_09
BUS STOP IKEA TEBRAU

PROPOSED CONSTRUCTION AND COMPLETION TWO BUS STOP AND DRAINAGE WORKS FOR UPGRADING IKEA EXTERNAL ROADWORKS (PART OF JALAN KOTA TINGGI/ JALAN DESA TEBRAU & JALAN HARMONIUM), TEBRAU CITY, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.

 

Completion Date:   MARCH 2018
Client:   WOON BROTHERS CONSTRUCTION SDN. BHD.
Design & Build:   S.P. MULIA SDN. BHD.

 

BUS STOP_1
BUS STOP_10
BUS STOP_2
BUS STOP_3
BUS STOP_4
BUS STOP_5
BUS STOP_6
BUS STOP_7
BUS STOP_8
BUS STOP_9
PERMENANT SHEET PILE DESA TEBRAU
PROPOSED PERMENANT SHEET PILE AT BANDAR DESA TEBRAU FOR PLENTIUDE TEBRAU SDN. BHD.
 
Completion Date:   DECEMBER 2018
Client:   PLENITUDE TEBRAU SDN. BHD. 
Main-Con:   WOON BROTHERS CONSTRUCTION SDN BHD
Sub-Con:   S. P. MULIA SDN BHD
 

 

permenant sheet pile desa tebrau_01
permenant sheet pile desa tebrau_02
permenant sheet pile desa tebrau_03
permenant sheet pile desa tebrau_04
permenant sheet pile desa tebrau_05
SOUTHKEY BURIED LPG TANK

PERMOHONAN PELAN BANGUNAN DI BAWAH AKTA 133 BAGI TUJUAN PEMBANGUNAN 1 BLOK BANGUNAN PERDAGANGAN 7 TINGKAT YANG MENGANDUNGI 2 TINGKAT BAWAH TANAH TEMPAT LETAK KERETA DAN KEMUDAHAN M&E & 5 TINGKAT KOMPLES PERNIAGAAN DAN TEMPAT LETAK KENDERAAN BERTINGKAT DI ATAS LOT PTD 221509 SELUAS 32.48 EKAR, JALAN BAKAR BATU, MUKIM PLENTONG, DAERAH JHOR BAHRU, JOHOR BAHRU UNTUK TETUAN SOUTHKEY MEGAMALL SDN BHD

Project Completion:   OCTOBER 2018
Client:   SOUTHKEY MEGAMALL SDN BHD
Main-con:   KIMLUN SDN BHD
Main-Con:   S. P. MULIA SDN BHD

 

LPG tank_01
LPG tank_02
LPG tank_03
LPG tank_04
LPG tank_05
SOUTHKEY TNB MANHOLE
PROPOSED 2 NOS TNB RC MANHOLE 9M X 6M X 2M HEIGHT AT SOUTHKEY, JOHOR BAHRU
 
Project Completion:   OCTOBER 2018
Client:   SOUTHKEY CITY
Main-Con:   LINKBUILD SDN BHD
Sub-Con:   S. P. MULIA SDN BHD

 

tnb manhole_01
tnb manhole_02
tnb manhole_03
tnb manhole_04
tnb manhole_05
TAMAN IMPIAN EMAS BOX CULVERT
PROPOSED CONSTRUCTION AND COMPLETION OF REINFORCED CONCRETE MAIN DRAIN AND RETAINING WALL WORKS FOR TAMAN IMPIAN EMAS PHASE 10A EARTHWORKS CONTRACT AT MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
 
Completion Date:   DECEMBER 2018
Client:   GUNUNG IMPIAN DEVELOPMENT SDN. BHD.
Main-Con:   WOON BROTHERS CONSTRUCTION SDN BHD
Sub-Con:   S. P. MULIA SDN BHD

 

box culvert 1.8M
box culvert 1.8M_02
box culvert 2.4M_01
box culvert 2.4M_02
box culvert 3.0M_01
DESA CEMERLANG ROAD WIDENING IN FRONT CHIS
PROPOSED ROAD WIDENING TO EXISTING MAIN ROAD FRONTING CHIS/CIS AT JALAN LEBU CEMERLANG, TAMAN DESA CEMERLANG, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DAUL TAKZIM FOR M/S CRESCENDO DEVELOPMENT SDN BHD
 
Completion Date:   OCTOBER 2018
Client:   CRESCENDO DEVELOPMENT SDN BHD
Main-Con:   UNIBASE CORPORATION SDN BHD
Sub-Con:   S. P. MULIA SDN BHD

 

road widening_01
road widening_02
road widening_03
road widening_04
Copyright © 2012 S.P.MULIA SDN BHD