Eco Garden Bridge 2
Eco Garden Bridge 2
Eco Garden Bridge 1
Eco Garden Bridge 1

 
DESIGN & BUILD / RE-ENGINEERING
  • Cast In situ post tensioned balance cantilever bridge using steel traveller form
  • Cast in situ reinforced concrete box girder using heavy duty shoring
  • Cast in situ post tensioned beams, suitable for curve bridge
  • Incremental launching post tensioned bridge, bridge is cast near the shore and push outward to the pier
  • Approach Bridge Structure
  • Pre-tensioned Bridge
  • Post-tensioned Bridge

view more »

Reservoirs
KONG KONG 500,000 GALLON RC RESERVOIR
PROPOSED 500,000 GALLONS ELEVATED R.C. RESERVOIR ON LOT 123208
(PTD 171000), LOT 123209 (PTD 171001) AND LOT 123210 (PTD 171002)
MUKIM PLENTONG, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
Project Completion:   JUN 2017
Client:   TENTU TEGUH SDN BHD
Main-Con:   KIMLUN SDN BHD
Sub-Con:   S. P. MULIA SDN BHD

 

Rc Reservoir_1
Rc Reservoir_12
Rc Reservoir_13
Rc Reservoir_14
Rc Reservoir_15
Rc Reservoir_16
Rc Reservoir_18
Rc Reservoir_20
Rc Reservoir_21
Rc Reservoir_22
Rc Reservoir_23
Rc Reservoir_24
Rc Reservoir_3
Rc Reservoir_4
Rc Reservoir_6
Rc Reservoir_7
Rc Reservoir_8
Rc Reservoir_9
Jalan Taruka Reservoir
PROPOSED IMPROVEMENT WORKS TO REPLACE WATER SUPPLY FROM PUB OFFTAKES IN JOHOR, PROPOSED 9.09ML SUCTION TANK, BOOSTER STATION, TNB-SUBSTATION AND 2.27ML ELEVATED RESERVOIR.
 
Project Completion:   JANUARY 2005
Client:   SAJ HOLDINGS SDN BHD
Main-Con:   RANHILL CIVIL SDN BHD
Sub-Con:   S. P. MULIA SDN BHD
April 2004
April 2004
August 2004
August 2004
August 2004
August 2004
August 2004
August 2004
December 2003
December 2003
December 2003
December 2003
December 2003
December 2003
December 2003
December 2003
February 2004
January 2004
January 2005
January 2005
July 2004
July 2004
July 2004
Jun 2004
Jun 2004
Jun 2004
Jun 2004
Jun 2004
Jun 2004
Jun 2004
Jun 2004
May 2004
May 2004
May 2004
November 2003
November 2003
November 2003
November 2004
October 2003
October 2003
September 2004